Articles | Volume 17, issue 2
https://doi.org/10.5194/acp-17-921-2017
https://doi.org/10.5194/acp-17-921-2017
Research article
 | 
20 Jan 2017
Research article |  | 20 Jan 2017

Resolution dependence of uncertainties in gridded emission inventories: a case study in Hebei, China

Bo Zheng, Qiang Zhang, Dan Tong, Chuchu Chen, Chaopeng Hong, Meng Li, Guannan Geng, Yu Lei, Hong Huo, and Kebin He

Viewed

Total article views: 4,948 (including HTML, PDF, and XML)
HTML PDF XML Total Supplement BibTeX EndNote
3,042 1,782 124 4,948 493 105 141
  • HTML: 3,042
  • PDF: 1,782
  • XML: 124
  • Total: 4,948
  • Supplement: 493
  • BibTeX: 105
  • EndNote: 141
Views and downloads (calculated since 24 Oct 2016)
Cumulative views and downloads (calculated since 24 Oct 2016)

Viewed (geographical distribution)

Total article views: 4,948 (including HTML, PDF, and XML) Thereof 4,917 with geography defined and 31 with unknown origin.
Country # Views %
  • 1
1
 
 
 
 

Cited

Latest update: 30 May 2025
Download
Short summary
The resolution dependence of uncertainties in proxy-based gridded inventories can be explained by the decoupling of emission facility locations from spatial proxies on fine scales. We conclude that proxy-based inventories are of sufficient quality to support regional and global models (larger than 0.25° in this case study); however, to support urban-scale models with accurate emission inputs, bottom-up inventories incorporating exact locations of emitting facilities have to be developed instead.
Share
Altmetrics
Final-revised paper
Preprint